Please See below for Instulation Guide Available in White,Grey,Terrocotta and Brown |
Features:
Secure, clip fixing avoids wind uplift problems.
Mortar-free, eliminating wet trades and associated problems.
Allows all weather fixing.
The one system suits most makes and profiles of single lap tile.
Available in terracotta, slate grey or brown, to blend with rest of the roof
Completely weatherproof and maintenance free.
Quick and easy to fix, requiring no special tools.
Compatible with any ridge system, wet or dry.
Performance
Suits most interlocking tiles between 280-345mm gauge. It does not suit Redland Cambrian, Richmond, Saxon, Marley Monarch and Anchorlite Slate. Redland Stonewold II and Delta will work at a maximum gauge of 345mm. If you have any queries on tile suitability please contact us.
Uni Dry-Verge
Installation Guide
|
Professional roofing accessories Uni Dry Verge |
|
![]() |
![]() |
![]() |
![]() |
| 1 | 1a | 2 | 3 |
![]() |
![]() |
![]() |
![]() |
| 4 | 5 | 6 | 7 |
| 1. Extend the tiling battens 20mm beyond the
gable wall or barge board and nail a Batten End Clip to the end of every batten. 1a. If a batten end clip is not being used we recommend that the batten is extended 30mm over the barge board or brickwork and 40mm (minimum) x 3.25mm ring shank nails are used to fix the verge units. Prior to fixing the batten ends must be in good condition with no signs of decay or splitting. 2. Fix the Eaves Closure to the end of the fascia board or brick work. 3. Fit the first verge section ensuring that it is located onto the eaves closer 4. Nail in position, through the Batten End Clip into the batten. 5. As each successive verge tile is laid, slide on a Uni-Dry Verge Unit upto the tile toe, engaging with the Unit below, nail in position through the Batten End Clip into the batten. 6. Insert a Ridge Closure into the last Unit, interlocking the combs of each Uni-Dry Verge Unit at the apex. 7. Screw fix the Ridge End Cap to the ridge batten. |
RETRO FIT If dry verge units are to be fitted to existing buildings all of the old undercloak and mortar bedding should be removed prior to fixing. A timber batten can then be installed running from the eave to ridge, this batten should protrude 30mm over the barge board or brick work/render for the units to fix into (as per step 1a). TIMBER FRAME If verge units are to be fitted to timber frame buildings prior to the outer weather covering being applied care should be taken for them to be positioned correctly so when the outer skin of the building is installed the verge units fit correctly and are not in the way of the top of the covering and the gap between the verge unit and the outer skin is maintained. This product should not be installed prior to the outer covering being installed if the eaves closer can not be fixed Full fixing instructions are given with each Uni-Dry Verge Unit pack. |
|
Professional roofing accessories Klober Dry Verge Fixing is Quick and Easy
|
![]() |
| Pack contents: Dry Verge Units Single Batten Clips Single End Caps 2 Ridge end caps and 4 Screws Eaves Ridge Pack 2 Ridge Closures, 2 Eaves Closures and Nails
|
![]() Eaves Closer
Ridge Closer
Batten End Clip
Fixings
|
| Typical Verge Detail
|
![]() Left Hand Verge
Right Hand Verge
Round Ridge Cap
Uni Ridge Cap |